More Info | 2024 St. Lucie Inlet Operation and Maintenance | The navigation maintenance of the St. Lucie Inlet with material placement in off-shore borrow area B. | In Design | Coastal | District 1 District 2 District 3 District 4 District 5 | District 1, District 2, District 3, District 4, District 5 | |
More Info | Automatic Meter Read (AMR) Replacement | 3200 water meters are being replaced per year throughout the County. | Construction | Utilities, Water & Sewer | District 1 District 2 District 3 District 4 District 5 | District 1, District 2, District 3, District 4, District 5 | |
More Info | Cypress Creek Floodplain Restoration | This project is to design, permit and build a structure within Cypress Creek to restore the freshwater floodplain of this critical tributary. Cypress Creek is one of the main tributaries to the Loxahatchee River and its restoration is critical to the river's health. The project includes a feasibility study to determine what the structure will be made, where it would be located and how to best access the area. Once the feasibility study has been completed, full design will begin. The project will require obtaining a permanent access and maintenance agreement with the Florida Park Service. Staff is seeking grant funding to off-set the costs of design and construction. | In Design | Environmental & Stormwater | District 3 | District 3 | |
More Info | Dixie Stormwater & Streetscape Project | Hobe Sound - Dixie Stormwater & Streetscape Project includes the vision for the existing streetscape to be extended from Bridge Road down A1A (Service Road). The streetscape extension will improve drainage, beautify the corridor and clearly define the sidewalk for pedestrians. | Proposed | Community Redevelopment Area (CRA) | District 3 | District 3 | Hobe Sound |
More Info | Gomez Corridor Neighborhood Restoration - Resurfacing | This infrastructure reinvestment project addresses the infrastructure backlog within the County maintained neighborhood local roadways along Gomez Avenue from SE Bridge Road to SE Osprey Street. The project includes the replacement of drainage structures, drainage improvements where necessary, regrading of drainage swales, repair of damaged sidewalk, addition of sidewalk connections, pavement resurfacing, and ancillary items within the neighborhood. | Construction | Neighborhood Restoration | District 3 | District 3 | |
More Info | Hobe Heights - Drainage Outfall | Hobe Heights structure demolition and site restoration project involves the restoration of residential property to pre-development conditions in the Hobe Heights neighborhood.
The next phase will involve designing the drainage outfall. It will be for the 10-year 1 day,25-year 3-day & 100-year 3-day rain events. | In Design | Neighborhood Restoration | District 3 | District 3 | |
More Info | Hydrant Replacement | Replace older and obsolete fire hydrants as needed on an annual basis. | Construction | Utilities, Water & Sewer | District 1 District 2 District 3 District 4 District 5 | District 1, District 2, District 3, District 4, District 5 | |
More Info | SE County Line Road Bridge Replacement | Replacement of a roadway bridge originally built in 1974. Project also includes removing separate pedestrian bridge and incorporating into a single structure. | In Design | Bridges | District 3 | District 3 | |
More Info | SR-708/Hobe Sound Drawbridge Electrical & Control Rehabilitation Project | The drawbridge will undergo electrical and command & control rehabilitation. The project will include the replacement and upgrade of critical electrical components. In addition to the electrical work, there will be limited mechanical work completed in conjunction with electrical to improve the condition of the bridge and address improvements recommended by the Florida Department of Transportation. | Construction | Bridges | District 3 | District 3 | |
More Info | Sanitary Sewer Lining and Manhole Repair | Project to line existing sanitary sewers and restore manholes at strategic locations to reduce large amounts of infiltration and inflow (I/I). During heavy rainfall events, large amounts of spurious rainfall runoff infiltration the older portions of the County's sanitary sewer system. This project will be ongoing until infiltration and inflow (I/I) is reduced to an acceptable level. | Construction | Utilities, Water & Sewer | District 1 District 2 District 3 District 4 District 5 | District 1, District 2, District 3, District 4, District 5 | |
More Info | Traffic Signal on US-1 (SE Federal Hwy) at SE Constitution Blvd | Install a traffic signal at the intersection of US-1 (SE Federal Highway) at SE Constitution Boulevard.
The Board of County Commissioners approved development along SE Constitution Boulevard at its intersection with US-1 / SE Federal Highway, which is a state highway. Subsequently, the Board of County Commissioners directed staff to request the Florida Department of Transportation (FDOT) install a traffic signal at this location. | In Design | Traffic | District 3 | District 3 | |
More Info | Tropic Vista Neighborhood Restoration | The Infrastructure Reinvestment project includes the replacement of drainage structures, regrading of drainage swales, pavement milling, resurfacing, replacement of sidewalks, and other ancillary items within the neighborhood. This project completes the neighborhood restoration of the Tropic Vista subdivision along SE County Line Road. | Proposed | Neighborhood Restoration | District 3 | District 3 | |