More Info | 2024 St. Lucie Inlet Operation and Maintenance | The navigation maintenance of the St. Lucie Inlet with material placement in off-shore borrow area B. | In Design | Coastal | District 1 District 2 District 3 District 4 District 5 | District 1, District 2, District 3, District 4, District 5 | |
More Info | Airport Operations Center and Airfield Electrical Vault - Construction | Construct new airport operations center building and airfield electrical vault
The current building does not meet the space requirements for the Airport staff and operations. The location occupies valuable airside property. | Construction | Airport | District 2 | District 2 | |
More Info | Automatic Meter Read (AMR) Replacement | 3200 water meters are being replaced per year throughout the County. | Construction | Utilities, Water & Sewer | District 1 District 2 District 3 District 4 District 5 | District 1, District 2, District 3, District 4, District 5 | |
More Info | Coral Gardens Neighborhood Restoration | The Infrastructure Reinvestment project includes the replacement of drainage structures, adding drainage conveyance structures, regrading of drainage swales, pavement milling, resurfacing, replacement of sidewalks, and other ancillary items within the neighborhood. This project completes the neighborhood restoration of the Coral Gardens subdivision. | Construction | Neighborhood Restoration | District 2 | District 2 | |
More Info | Dixie Hwy Resurfacing (Monterey to 5th St.) | Asphalt milling and resurfacing on CR A1A (Dixie Highway) from Monterey Road to 5th Street. The project will also include the removal and replacement of failing drainage piping and new pavement markings. This project is funded by the Florida Department of Transportation (FDOT) through the Small County Outreach Program (SCOP) and administered by Martin County Public Works Department. | Completed | Roadways | District 2 | District 2 | |
More Info | Gaines Avenue Water Main Assessment with Force Main | Proposed water main assessment to serve approximately 160 single family residential units. | In Design | Utilities, Water & Sewer | District 2 | District 2 | |
More Info | Golden Gate - El Camino Trail | The Golden Gate Community Redevelopment Plan calls for a system of pedestrian and bike trails. This project will provide connections to existing pathways located within the community. This multi-modal, linear park pathway will provide pedestrian and bicycle connections, increase safety, encourage walking and riding, and become a beautiful neighborhood asset. The project represents a coalition of county departments, with a variety of departments represented, CRA, Public Works, Utilities and Parks and Recreation. | Construction | Community Redevelopment Area (CRA) | District 2 | District 2 | Golden Gate |
More Info | Golden Gate North Outfall | This project has been awarded resiliency funding through the State of Florida. This project also received preliminary notification of additional 319 water quality funding for 2023. The north outfall canal for the Golden Gate STA experiences tidal backflow reducing the storage of the lake and increasing salinity. Martin County made improvements to the southern outfall in 2020, but two STAs are still impacted by tidal backflow, increasing saltwater in the wetland. This project will consist of the construction of a new weir structure to protect the STA’s North outfall from impacts caused by storm surge and sea-level rise (SLR). The project will also increase the stormwater retention volume, thus improving water quality. Building a new stormwater outfall control structure and restore portions of the outfall canal utilizing nature-based solutions for erosion control and water quality. The outfall control structure shall meet the intent of reducing saltwater intrusion within the STA, increasing the stormwater storage capacity, and improving water quality within the basins associated with this outfall. The outfall canal itself will be regraded using typical excavation methods but will be restored with natural solutions for erosion control, such as American Eelgrass (Vallisneria Americana) or Widgeon Grass (Ruppia Maritima) also utilize native vegetation as necessary to stabilize the banks. Monitoring and maintenance of the ditch lines will be performed following the project to document the success rate and factors that impact or promote this method as a viable natural solution to stormwater ditch erosion control and sediment stabilization. | In Design | Environmental & Stormwater | District 2 | District 2 | Golden Gate |
More Info | Golden Gate Phase II Resurfacing | Replacement of drainage structures, regarding of drainage swales, pavement milling and resurfacing, and replacement of sidewalk and other ancillary items within the neighborhood. | Construction | Neighborhood Restoration | District 2 | District 2 | |
More Info | Harbor Estates / Linden Street Neighborhood Restoration: Phase II Resurfacing | Replacement of drainage structures, regrading of drainage swales, replacement of aging utilities owned by Martin County, pavement milling & resurfacing, new sidewalk, traffic calming and other ancillary items within the neighborhood. This project completes the neighborhood restoration of Harbor Estates, Live Oak Estates, and Linden Street corridor areas. | In Design | Neighborhood Restoration | District 2 | District 2 | |
More Info | Hydrant Replacement | Replace older and obsolete fire hydrants as needed on an annual basis. | Construction | Utilities, Water & Sewer | District 1 District 2 District 3 District 4 District 5 | District 1, District 2, District 3, District 4, District 5 | |
More Info | Indian St Resurfacing (SE Gatehouse Circle to US1) | Asphalt milling and resurfacing on Indian St from SR76 to US1. The project will also include the restoration of failing drainage pipe culverts and new pavement markings. This project is funded by the Florida Department of Transportation (FDOT) through the Small County Outreach Program (SCOP) and administered by Martin County Public Works Department. | Construction | Roadways | District 2 | District 2 | |
More Info | Marine Patrol Offices - Sandsprit Park | Currently the MCSO is leasing a portable office space located within Sandsprit Park. The 300 sq ft office trailer insufficient to support the Marine Patrol's mission and it is not an appropriate structure to be located in a prominent location within Sandsprit Park. Construction of a new building would eliminate the need to continue leasing office space. | Construction | Facilities | District 2 | District 2 | |
More Info | Public Safety Training Facility | Build a training facility to be used for Fire Rescue Operations and other county departments' training needs. The four-story, Class A burn structure will include simulators for forcible entry, search and rescue operations and other tactical operations required to train firefighters in safe and effective responses. The 3,000-square foot training building will include two classrooms with storage and office space for training personnel. The driving course will include a 4-acre asphalt range for emergency vehicle operator training and a designated area for additional vehicle safety courses for all county departments. Smaller training sites will include vehicle extrication, special operations and tactical training. | Construction | Facilities | District 2 | District 2 | |
More Info | SE Indian Street Dual Left-Turn Lanes at SE Willoughby Boulevard | Addition of dual left-turn lanes on SE Indian Street at its intersection with SE Willoughby Boulevard; mast arm upgrades to accommodate hardening and future anticipated improvements. Construction is expected to begin in the spring of 2024. | Construction | Traffic | District 2 | District 2 | |
More Info | SE Salerno Road Sidewalk (Willoughby to Cable) | Construction of an 6-foot wide sidewalk along the north right-of- way of SE Salerno Road from SE Willoughby Boulevard to approximately 88 feet west of SE Cable Drive. The project connects the missing links of sidewalk along the north side of SE Salerno Road. A private developer is required to complete the missing sidewalk link between SE Cable Drive and US-1 / SE Federal Highway. This project is Federally funded through the Local Agency Program (LAP) directed by the Florida Department of Transportation (FDOT) and administered by Martin County Public Works Department. | Construction | Sidewalks | District 2 District 4 | District 2, District 4 | |
More Info | SE Salerno Road Traffic Safety Improvements | The Board of County Commissioners negotiated a $100,000 contribution from the adjacent Willoughby Townhomes Planned Unit Development as a public benefit of the Planned Unit Development Zoning Agreement after requests of residents along SE Salerno Road for traffic safety improvements. The Public Works Department is coordinating multimodal improvements through the District 2 Commissioner's office after meeting with local residents.
Radar Speed Feedback signs were installed in early June 2023. | Construction | Traffic | District 2 | District 2 | |
More Info | SPS/Manatee Business Park Restoration | The Infrastructure Reinvestment project includes the replacement of drainage structures, regrading of drainage swales, addition of new sewer force main, pavement milling, resurfacing, replacement of sidewalks, and other ancillary items within the neighborhood. This project completes the neighborhood restoration of the SPS Commerce Park, Manatee Business Park, and SE Commerce Avenue. | Proposed | Neighborhood Restoration | District 2 District 4 | District 2, District 4 | |
More Info | SR 714 SE Monterey Road and CR-A1A Multimodal Pathway | Pedestrian and bicyclist improvements at the intersection of SE Monterey Road, SE
Palm Beach Road, and SE Dixie Highway. The multimodal pathway will be along the
east side of SE Dixie Highway from Monterey Road to SE Airport Road. | In Design | Sidewalks | District 2 | District 2 | |
More Info | Sandsprit Park Boat Ramps (East & West) | UPDATED - Jan 1, 2024 - Project is fully funded and has been awarded to the Shoreline Foundation, Inc.
PROGRAM GOAL
Implement design considerations that address general improvements that includes, but not are limited to designing for sustainability and resiliency, repair or replace boat ramp surfaces, floating docks, fixed docks, pilings, lighting, shoreline protection, curbing, ADA compliance, and miscellaneous repairs.
Status - East Ramp Open, West ramp under construction | Construction | Parks | District 2 | District 2 | |
More Info | Sanitary Sewer Lining and Manhole Repair | Project to line existing sanitary sewers and restore manholes at strategic locations to reduce large amounts of infiltration and inflow (I/I). During heavy rainfall events, large amounts of spurious rainfall runoff infiltration the older portions of the County's sanitary sewer system. This project will be ongoing until infiltration and inflow (I/I) is reduced to an acceptable level. | Construction | Utilities, Water & Sewer | District 1 District 2 District 3 District 4 District 5 | District 1, District 2, District 3, District 4, District 5 | |
More Info | Sheriff K-9 Training and Kennel Facility | The Martin County Sheriff's Office currently does not have a designated training/care area for the K-9 unit as the previous location for K-9 training and care was eliminated to make room for the evidence storage building. The new facility will centralize housing, care and training for the K-9 unit and will be located on county property directly south of the Holt Correctional Center. | Construction | Facilities | District 2 | District 2 | |
More Info | Taxiway Alpha Rehabilitation and Lighting | Full length pavement rehabilitation of Taxiway A including storm water drainage, taxiway lights, and airfield signage improvements. The rehabilitation will last 360 days broken into phases to alleviate the impact to airport tenants and visitors. | Construction | Airport | District 2 | District 2 | |